- Feasibility Study, Cost Benefit Analysis (CBA) and provision of Supporting Services for the project “Phase II: DC Interconnection, 2×350 MW capability, Crete-Attica, Independent Power Transmission Operator (IPTO), Greece
- Feasibility Study, Cost Benefit Analysis (CBA) and provision of Supporting Services for the project 150 kV AC INTERCONNECTION 2×200 MVA (2×140 MW) CRETE-PELOPONNESE, Independent Power Transmission Operator (IPTO), Greece
- The 2nd Backbone UHV Corridor Kakhovka – Primorska – Dnistrovska – Khmelnitska: Feasibility study for the 750 kV Interconnection Line, EBRD, Ukraine
- Trans-Adriatic Pipeline (TAP) Greek Section – Route Refinement, Environmental and Social Impact Assessment (ESIA), ON SE, Greece
- Basic Engineering Design, Environmental and Social Impact Assessment, Safety and Other Studies for the 2nd Expansion of the LNG Terminal at Revithoussa Island, Hellenic Gas Transmission System Operator (DESFA) S.A., Greece
- Feasibility Study for the construction of Tirana 3 New Substation 220/110 kV and 110 kV Tirana Ring reinforcement, European Commission, COWI – IPF Consortium, Albania
- Feasibility Study and Environmental & Social Impact Assessment (ESIA) for Serbian Gas Transmission Pipeline (to Bulgaria), European Commission, COWI – IPF Consortium, Serbia
- Environmental & Social Impact Assessment (ESIA) for the Burgas – Alexandroupolis Crude Oil pipeline (BAP), Trans-Balkan Pipeline B.V., Greece
- Environmental and Social Impact Assessment (ESIA) for three Wind Farms in Bosnia, KfW, Electricity Utility of Mostar, Bosnia
- Ferizaj2 Substation Technical specifications, European Commission – KOSTT, Kosovo
- Power Generation and Environmental Permitting for a Natural Gas Fired Combined Cycle Power Plant of 153 MW Installed Capacity, Private Client, Greece
- Environmental Management in four Hydropower Plants and Megalopolis Thermo-electric Lignite-fired Power Plants, Public Power Corporation (PPC) S.A., Greece
- Environmental Impact Assessment (EIA) and Concession Study for Aliveri Natural Gas Pipeline, Hellenic Gas Transmission System Operator (DESFA) S.A., Greece
- Environmental Impact Assessment (EIA) for a 400 MW CCNG Power Plant and the HV Transmission Line for its connection to the Grid, Private Client, Greece
- Power Generation and Environmental Permitting for a 30 MW installed Wind Park at Evros, Private Client, Greece
- Cost–Benefit Analysis of the Medium and Low Pressure Natural Gas Distribution Network in the wider area of Halkis, Evia, Public Gas Corporation (DEPA) S.A., Greece
- Cost–Benefit Analysis of energy investments on behalf of PPC including the Electric Interconnection of Cyclades islands, the construction of High Voltage Substations and Underground Transmission Lines and the Kos – Kalymnos Islands Submarine Transmission Line, Public Power Corporation (PPC) S.A., Greece
- Environmental Permitting for the 150 kV Transmission Line connecting an Independent Power Plant (IPP) to the Grid, Private Client, Greece
- Environmental and Social Impact Assessment (ESIA) for the Rivne – Kiev High Voltage Transmission Line, EBRD, Ukraine
- Environmental Impact Assessment (EIA) for a Floating Storage Regasification Unit (FSRU) at Vassilicos, Single Buoy Moorings (SBM) Inc., Cyprus
- Route optimisation and Environmental Impact Assessment (EIA) for the onshore section of the Greece – Italy Gas Interconnection (IGI) Pipeline, Hellenic Gas Transmission System Operator (DESFA) S.A., Greece
Related Sector
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT Privacy & Cookies Policy
Comments are closed.