Basic Engineering Design, Environmental and Social Impact Assessment, Safety and Other Studies for DESFA LNG Regasification

DESFA, the Hellenic Gas Transmission System Operator, intends to expand for the second time the LNG terminal at Revithoussa island by increasing the sustainable maximum send out rate from 1000 to 1400 Nm3/hr and the peak send out rate up to 1650 Nm3/hr. The study was awarded to an international consortium comprising RINA, D’Appolonia and EXERGIA. The services provided by EXERGIA comprise:

  • Elaboration of H&S plan and H&S file according to Greek legislation
  • Preparation of a Safety Study, incorporating the results of HAZOP and HAZID studies
  • Preparation of ESIA according to Greek legislation and taking into account international standards